Gilbert, Jin, Berger, Henriksen, FAA/NASA/ITT FCS Technology Investigation Final Report, NASA Contractor Report CR-2008-215144, April 2008. Summarizes and documents the work performed to investigate technologies that could support long-term aeronautical mobile communications operating concepts for air traffic management (ATM) in the timeframe of 2020 and beyond, and includes the associated findings and recommendations made by [...]
Author: ACAST
|
Categories: FCS, Library
| Tags: ATM, NextGen
February 1, 2008 – 11:37 am
Gilbert, Jin, Berger, Henriksen, FAA/NASA/ITT FCS Phase III Study Final Report, NASA Contractor Report, CR-2008-214987, February 2008. Documents the indepth studies on select technologies that could support long-term aeronautical mobile communications operating concepts. This work was performed during the third and final phase of NASA’s Technology Assessment for the Federal Aviation Administration (FAA)/EUROCONTROL Future Communications [...]
Author: ACAST
|
Categories: FCS, Library
| Tags: Library
February 1, 2008 – 11:34 am
Henriksen, NASA/ITT UAS Study Task Final Report, NASA Contractor Report CR-2008-214841, February 2008. There are significant activities taking place to establish the procedures and requirements for safe and routine operation of unmanned aircraft systems (UAS) in the National Airspace System (NAS). Among the barriers to overcome in achieving this goal is the lack of sufficient [...]
Author: ACAST
|
Categories: FCS
| Tags: ITT
ITT’s final briefing on the task order study, Unmanned Aircraft System Control and ATC Communications Bandwidth Requirements, held on February 28, 2007, is now available. You can also view the accompanying report, NASA/CR—2008-214841, found on the NASA GRC Technical Report Server.
Author: ACAST
|
Categories: Library